Profile
BKU I
BKU II
BKU aqua®
News
References
Downloads
Contact
Home
Deutsch
 
News
News

Following projects are realized:

- Control station

In Mönchenglattbach BKU II was used for a 1.600m² largely control station.

StaubauwerkStaubauwerkStaubauwerk

- Power station

The gutter lining of the power station in Neurath (block F & G) with approx. 1,900 running meters was accomplished with BKU II.

- Dump

The 110m ² large seeping water inclined shaft was lined doubly with BKU II.

 

 BKU Lampertheim Call: +49 (0) 6206 / 911 4-24