Following projects are realized:
Control station
In Mönchenglattbach BKU II was used for a 1.600m² largely control station.
  
Power station
The gutter lining of the power station in Neurath (block F & G) with approx. 1,900 running meters was accomplished with BKU II.
Dump
The 110m ² large seeping water inclined shaft was lined doubly with BKU II.
|